ABS Water Division Barrier
ABS Water Division Barrier

ABS Water Division Barrier

Removable flood control embankment water gate quick temporary flood control board portable dam flood control barrier
ABS Flood Control Embankment Mountain Wall Temporary Flood Control Embankment Portable Flood Control Embankment
24-hour free consultation hotline
Product Details
ABS Water Division Barrier
ABS Water Division Barrier

Product  Paramerters

Place of OriginWuxi,China
Product NameTemporary Flood Barrier
SizeH0.5M/0.8M/1.0M, Standard Dimension
Surface Treatmentnone
Product FeaturesNo pre-installation required
TechnicsStamping
ApplicationFlood Protection
OEMAccept
Product Description

PURPOSE
In recent years, world-wide climate changes bring morfe and more heavy rains and typhoons lead to
severe flood to our cities especially in low-lying areas near ocean, which has resulted in large amounts of
property damage.

At this stage, the traditional sandbags solution has many shortcomings, such as long preparation time,
inconvenient transportation, and carrying difficulties. And some customers don't want any pre-construction at site but prefer the fully removable temporary flood protection solutions.

Our company's newly developed temporary flood control water barrier, has a small storage footprint, none pre-construction required, easy and quick installation, good water blocking effect and many other advantages, is the first choice for future urban flood control.

Our temprary flood barrier products--the L-Shape Free Standing Flood Board FLOODGUARD, is including F50 series for a flood protection height H50CM, and F80 series for a flood protection height H80CM, as well as F100 series for H100CM protection.


1736910361944429.jpg


2nd Gen. L-Shape Free Standing Flood Board
Waterproof Greatly Improved

 The addition of the front P-shape EPDM seal increases the waterproof performance by 50% and significantly reduces the water leakage which reaches the standard of Japan's Class 1 waterproof equipment.

Structure Significantly Strengthened

The 1st generation of board joints were at 90° angles and were easily damaged due to stress concentration. We have changed the shape of the joint surface of the board to a folded angle, thus dispersing the stress and significantly improving the structural strength.

New Stainless Steel Locking Clamp Design

A stainless steel locking clamp is new provided on the board, to lock each connecting board. The 1st generation was buckled together directly by the slotted channel in the board, due to the low strength of the plastic material offering un-sufficient locking strength, in extreme cases these buckles may slip out leads to a risk of failure. The new stainless steel locking design makes the connection more stable, and doubled the overall rigidity of the full system.

Contacting Interface Reinforced

Reinforcing bracket with the seals is designed at the contacting interface to prevent damage and extend the life.

Storage Space Reduced

The boards can be stored in two or three pieces connected and placed on its side, to reduce the storage area. And the
assembled form can reduce the transporting and deploy time for emergency.

Deployment

1. Confirm the site for deployment

2. Clean the gound of the site

3. Stand behind the flood board to place the front of the board facing the water

4. Set the first left board(FG,FGL) as initial at the wet side.

5. Connect the following to the right end. 

6. Apply the right board(FG,FGR) to tightly connect the wall at right side.

1736910308149409.png


1736910331111415.png


Engineered Flood Defences That Work
We use cookies to allow our website to function properly, provide social media functionality, and analyze traffic. We also share information with our partners about your use of our website.
Reject
Accept
Contact Us
  • Name*
  • Tel*
  • Email*
  • Code*
  • Content*
Submit